Attendance at summertime and special services was far exceeding the original 1949 Church nave capacity. A 1970's addition had provided some 'flexible' overflow seating, but over time much of that space had been dedicated to administrative activities. We were asked to join the project team to complete and execute an expansion idea originally created by one of the parishioners.
A new addition providing permanent administrative space was planned, allowing for the older expansion to return to overflow and flexible meeting space. Given the nature of the original building, a seamless integration architecturally was critical.
Inside the building, we removed an old mechanical floor to open the ceiling of the overflow seating to align with the original south apse. New log and stonework was integrated into the old to bring the detail of the original nave into the later addition. A sprinkler system and fire alarm were also integrated to provide additional life safety and protect this unique structure.
Estes Park, Colorado Size: 4,100 square feet (addition) 16,500 square feet (total) Completed: 2008
© Copyright 2008 Basis Architecture P.C.Estes Park Colorado Architects